Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/711Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Presidency University Bangalore | - |
| dc.date.accessioned | 2018-07-10T03:16:52Z | - |
| dc.date.available | 2018-07-10T03:16:52Z | - |
| dc.date.issued | 2018-05 | - |
| dc.identifier.uri | http://hdl.handle.net/123456789/711 | - |
| dc.subject | Drilling engineering | en_US |
| dc.title | PET 208 Drilling engineering | en_US |
| Appears in Collections: | 2017 - 2018 II/IV/VI/VIII - Even Semester | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 208 PET 208 Drilling Engineering.pdf | 952.67 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
